0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1959
Completion: 17 August 1964
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Derwent River
Replaces: Hobart Bridge (1943)
Coordinates: 42° 51' 54" S    147° 20' 37" E
Show coordinates on a map

Technical Information

Dimensions

total length ca. 1 500 m
number of spans 1964: 22
1977: 21
number of lanes 1964: 4
1977: 5
eastern approach viaduct
span lengths 1964: 6 x 42.7 m
1977: 42.7 m - 85.34 m - 3 x 42.7 m
main bridge
main span 73 m
span lengths 43.4 m - 73 m - 43.4 m
western approach viaduct
span lengths 13 x 42.7 m

Materials

deck prestressed concrete
piers reinforced concrete

Chronology

17 August 1964

Official opening.

5 January 1975

Bulk ore carrier "Lake Illawara" collides with pier 19. Part of the bridge deck collapses claiming 12 lives.

Participants

Reconstruction (1975-1977)
Design
Contractor

Relevant Web Sites

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20001193
  • Published on:
    18/01/2001
  • Last updated on:
    10/06/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine