Restoration and widening of the Tasman bridge

Author(s):

Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Bridges = Ponts = Brücken, Zürich, Switzerland, 1979
Published in:
Year: 1979
DOI: 10.5169/seals-25614
Abstract: Three out of 22 river spans of the Tasman Bridge were destroyed by ship collision. The paper describes the method of debris survey in the deep water site conditions and the method of restoration determined therefrom. The unusual engineering tasks involved in the work included temporary repairs, demolition, major steel falsework, unusual vertical piling, the incorporation of a long steel span into the prestressed concrete bridge and erection techniques used. The whole bridge was widened concurrently with the restoration.

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.5169/seals-25614.
  • About this
    data sheet
  • Reference-ID
    10545140
  • Published on:
    15/01/2021
  • Last updated on:
    19/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine