General Information
Name in local language: | Pont de Tarascon-Beaucaire |
---|---|
Completion: | 2000 |
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Three-span cable-stayed bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Tarascon, Bouches-du-Rhône (13), Provence-Alpes-Côte d'Azur, France Beaucaire, Gard (30), Occitanie, France |
---|---|
Crosses: |
|
Coordinates: | 43° 47' 14.10" N 4° 39' 0.48" E |
Technical Information
Dimensions
main span | 192.8 m | |
total length | 407.50 m | |
span lengths | 25.55 m - 81.8 m - 192.8 m - 81.8 m - 25.55 m | |
number of spans | 5 | |
number of lanes | 2 | |
stay anchor spacing | 10.36 m | |
abutments | number | 2 |
deck | width | 12.10 m |
deck depth | 0.77 m | |
piers | number | 2 x 2 |
pylons | height | 67 m |
pylon height (above water) | 60 m | |
pylon height (above deck) | 40 m | |
number | 2 |
Quantities
reinforcing steel | 1 000 t | |
prestressing steel (19T15) | 125 t | |
steel for cable-stays | 180 t | |
deck | concrete volume | 2 500 m³ |
substructure | concrete volume | 5 500 m³ |
Cost
cost of construction | French Franc 60 000 000 |
Materials
cables |
steel
|
---|---|
deck |
prestressed concrete
|
piers |
reinforced concrete
|
pylons |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
- Arrondissement d'Arles
- Direction des Routes, Transports et Equipements
- Services Techniques du Conseil Général
Design
- CETE Méditerranée
- Sétra
- Michel Virlogeux (designer)
Architecture
- Charles Lavigne (architect)
Structural engineering
Main contractor
Co-contractor
Stay cables
Prestressing
Reinforcing steel
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- The Beaucaire-Tarascon cable-stayed bridge over the Rhone River. Presented at: fib Symposium 2004, 26-28 April 2004, Avignon, pp. 216-217. (2004):
- Cable-Stayed Bridge over the River Rhone, France. In: Structural Engineering International, v. 10, n. 4 (November 2000), pp. 221-223. (2000):
- Franchissement du Rhône. Le pont de Beaucaire-Tarascon. In: Travaux, n. 760 (January 2000), pp. 28-34. (2000):
- Freyssinet cable-stayed structures. Freyssinet International, Vélizy-Villacoublay (France), 2004, pp. 41.
- La liaison Beaucaire-Tarascon. In: Construction moderne ( 2000), pp. 39. (2000):
- About this
data sheet - Structure-ID
20000619 - Published on:
22/01/2000 - Last updated on:
11/08/2022