The Beaucaire-Tarascon cable-stayed bridge over the Rhone River
Author(s): |
Emmanuel Bouchon
Alain Chauvin Frédéric Edon Charles Lavigne Claude Letey Michel Virlogeux |
---|---|
Medium: | conference paper |
Language(s): | English |
Conference: | fib Symposium 2004, 26-28 April 2004, Avignon |
Published in: | Concrete Structures |
Page(s): | 216-217 |
Year: | 2004 |