0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): BW 13/14
Beginning of works: May 1994
Completion: January 1996
Duration of works: 20 months
Status: in use

Project Type

Location

Location: , , , , ,
Crosses:
  • Triwalker Graben
Part of:
Coordinates: 53° 51' 47.04" N    11° 30' 19.09" E
Show coordinates on a map

Technical Information

Dimensions

total length 395 m
span lengths 20.7 m - 14 x 25 m - 19.7 m
clearance 3 - 8 m
number of spans 16
bridge surface 11 776 m²
deck deck depth 1.25 m
deck width 2 x 15.00 m

Cost

cost of construction German Mark 18 600 000
cost of construction per m² German Mark 1 580.00

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20011515
  • Published on:
    28/02/2004
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine