General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Construction method: |
Balanced cantilever method |
Function / usage: |
Road bridge |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Schottwien, Lower Austria, Austria |
---|---|
Address: | im Verlauf der S6 - Semmeringschnellstraße |
Coordinates: | 47° 39' 7" N 15° 52' 10" E |
Technical Information
Dimensions
main span | 250.00 m | |
total length | 632.50 m | |
span lengths | 77.50 m - 162.50 m - 250.00 m - 142.25 m | |
number of spans | 4 | |
height above valley floor or water | 130.00 m | |
pier height | max. 79.00 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Contractor
Relevant Web Sites
Relevant Publications
- Les grands ponts du monde: Ponts remarquables d'Europe. Brissaud, Poitiers (France), pp. 145. (1990):
- About this
data sheet - Structure-ID
20007931 - Published on:
30/01/2003 - Last updated on:
05/02/2016