Informations générales
Type de construction
Structure: |
Box girder bridge Haunched girder bridge |
---|---|
Fonction / utilisation: |
Road bridge |
Matériau: |
Prestressed concrete bridge Structurae Plus/Pro - Abonnez-vous maintenant ! |
Méthode de construction: |
Balanced cantilever method |
Situation de l'ouvrage
Lieu: |
Schottwien, Lower Austria, Austria |
---|---|
Adresse: | im Verlauf der S6 - Semmeringschnellstraße |
Coordonnées: | 47° 39' 7" N 15° 52' 10" E |
Informations techniques
Dimensions
main span | 250.00 m | |
total length | 632.50 m | |
span lengths | 77.50 m - 162.50 m - 250.00 m - 142.25 m | |
number of spans | 4 | |
height above valley floor or water | 130.00 m | |
pier height | max. 79.00 m |
Matériaux
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Intervenants
Contractor
Sites Internet pertinents
Publications pertinentes
- Les grands ponts du monde: Ponts remarquables d'Europe. Brissaud, Poitiers (France), pp. 145. (1990):
- Informations
sur cette fiche - Structure-ID
20007931 - Publié(e) le:
30.01.2003 - Modifié(e) le:
05.02.2016