General Information

Name in local language: Talbrücke Oberhartmannsreuth
Official designation: BW 165-2
Beginning of works: 1999
Completion: 2000
Duration of works: 21 months
Status: in use

Project Type

Location

Location: , , , ,
Carries:
  • Autobahn A93
Part of:
Coordinates: 50° 20' 34.46" N    12° 0' 3.16" E
Show coordinates on a map

Technical Information

Dimensions

total length 201.60 m
span lengths 34.80 m - 3 x 44.00 m - 34.80 m
number of spans 5
number of spans 6
bridge surface 5 860 m²
number of lanes 2 x 2
deck deck width 29.08 m
number of longitudinal girders 2

Quantities

deck structural steel 480 t
concrete volume 2 100 m³
reinforcing steel 470 t
substructure concrete volume 1 650 m³
reinforcing steel 270 t
total length of piles 270 m

Design Loads

live load Brückenklasse 60/30
design code(s) DIN 1072

Cost

cost of construction German Mark 12 700 000

Materials

piers reinforced concrete (B 35)
deck slab reinforced concrete (B 35)
abutments reinforced concrete (B 35)
girders steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20007125
  • Published on:
    06/12/2002
  • Last updated on:
    04/02/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine