General Information
Completion: | 2007 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Precast segmental construction |
Material: |
Prestressed concrete bridge |
Location
Location: |
York County, Pennsylvania, USA Highspire, Dauphin County, Pennsylvania, USA |
---|---|
Crosses: |
|
Replaces: |
Susquehanna River Bridge (1950)
|
Coordinates: | 40° 12' 19" N 76° 48' 14" W |
Technical Information
Dimensions
total length | 1.8 km | |
number of spans | 40 |
Materials
deck |
precast prestressed concrete
|
---|
Participants
Owner
Design
Co-contractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Construction of the first precast segmental bridge in Pennsylvania uses DYWIDAG Strand Post-Tensioning Tendons. Construction of a new bridge across the Susquehanna River near Harrisburg, PA, USA. In: DSI Info, n. 15 ( 2007- 2008), pp. 75.
- DYWIDAG-Litzenspannglieder für erste Fertigteilsegmentbrücke in Pennsylvania. Neubau der Brücke über den Susquehanna Fluss in Harrisburg, PA, USA. In: DSI Info, n. 15 ( 2007- 2008), pp. 75.
- Investing in beauty. In: Bridge Design & Engineering, v. 12, n. 45 (4th Quarter 2006), pp. 42-43. (2006):
- PA pair. In: Bridge Design & Engineering, v. 10, n. 37 (4th Quarter 2004), pp. 15.
- About this
data sheet - Structure-ID
20014856 - Published on:
27/12/2004 - Last updated on:
05/02/2016