0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Construction of the first precast segmental bridge in Pennsylvania uses DYWIDAG Strand Post-Tensioning Tendons

Construction of a new bridge across the Susquehanna River near Harrisburg, PA, USA

Medium: journal article
Language(s): English
Published in: DSI Info, , n. 15
Page(s): 75

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10029857
  • Published on:
    06/02/2008
  • Last updated on:
    30/09/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine