General Information
Other name(s): | Talbrücke Streichgrund |
---|---|
Official designation: | 5314/02 |
Beginning of works: | 2000 |
Completion: | 2002 |
Duration of works: | 29 months |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Structure: |
Haunched girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Ilmenau, Ilm-Kreis, Thuringia, Germany Unterpörlitz, Ilmenau, Ilm-Kreis, Thuringia, Germany |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 50° 42' 43.60" N 10° 56' 7.85" E |
Technical Information
Dimensions
height | 23 m | |
total length | 450 m | |
deck | deck depth | 2.50 - 4.00 m |
deck width | 28.50 m | |
Northern bridge | ||
---|---|---|
span lengths | 35 m - 45 m - 55 m - 65 m - 85 m - 70 m - 54 m - 40 m | |
number of spans | 8 | |
Southern bridge | ||
span lengths | 37.6 m - 48 m - 57 m - 70 m - 85 m - 65 m - 50 m - 37.4 m | |
number of spans | 8 |
Cost
cost of construction (incl. taxes) | German Mark 29 000 000 | |
cost of construction per m² | German Mark 2 265 |
Materials
superstructure |
composite steel-reinforced concrete
|
---|
Participants
Owner
Client
Original design
Structural engineering
Engineering
- Ralf Schubart (engineer)
Architectural consulting
- Jakob (architectural consultant)
Checking engineering
Co-contractor
Construction supervision
Relevant Web Sites
Relevant Publications
- Brückenbauwerke in den neuen Bundesländern. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), 2004, pp. 169-174.
- Die Thüringer Wald-Autobahn. 1. Baustellenfahrt der Verlagsgruppe Wiederspahn. In: [ Umrisse ], v. 2, n. 3 ( 2002), pp. 48-49. (2002):
- About this
data sheet - Structure-ID
20000850 - Published on:
08/08/2000 - Last updated on:
05/02/2016