0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: January 2009
Completion: August 2010
Status: in use

Project Type

Structure: Tied-arch bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , , ,
Address: B 208
Crosses:
  • Elbe Lübeck Canal
Coordinates: 53° 44' 2" N    10° 38' 51" E
Show coordinates on a map

Technical Information

Dimensions

total length 87.0 m
span lengths 14.0 m - 59.0 m - 14.0 m
number of spans 3
bridge surface 1 205 m²
arch arch span 59 m
deck deck width 13.85 m

Quantities

structural steel 370 t
concrete volume 2 000 m³
reinforcing steel 260 t
paint 2 600 m²

Cost

cost of construction ca. Euro 9 600 000

Materials

arch steel
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20056406
  • Published on:
    27/04/2010
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine