General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel-reinforced concrete composite bridge |
Construction method: |
Longitudinal launching |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Bodenrode-Westhausen, Eichsfeld (Kreis), Thuringia, Germany |
---|---|
Carries: |
|
Crosses: |
|
Part of: | |
Coordinates: | 51° 24' 14.20" N 10° 12' 49.82" E |
Technical Information
Dimensions
total length | 372 m | |
span lengths | 54 m - 2 x 66 m - 78 m - 60 m - 48 m | |
number of spans | 6 | |
height above valley floor or water | 29.60 m | |
number of lanes | 2 x 2 | |
deck | deck depth | 4.65 m |
deck width | 29.50 m |
Quantities
structural steel | 2 200 t |
Cost
cost of construction (incl. taxes) | Euro 16 600 000 |
Materials
piers |
reinforced concrete
|
---|---|
girder |
steel
|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
Case Studies and Applied Products
ROBO®CONTROL Permanent – Remote Monitoring System
Robo®Control detects the absence of machine specifications at the component and conveys these to a central computer. There the data are processed and they are made available to the clients through internet.
[more]TENSA®MODULAR LR & LR-LS – Modular expansion joints
Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions and rotations around all 3 axes.
[more]Participants
Initial construction
Owner
Client
Original design
Contractor
Steel construction
Expansion joints
Monitoring
Monitoring equipment
Relevant Web Sites
- About this
data sheet - Structure-ID
20001348 - Published on:
11/03/2001 - Last updated on:
05/02/2016