General Information
Name in local language: | Ilmtalbrücke Stadtilm |
---|---|
Beginning of works: | February 2015 |
Completion: | November 2017 |
Status: | in use |
Project Type
Structure: |
Multi-span continuous girder bridge |
---|---|
Function / usage: |
Road bridge |
Structure: |
Single T-section girder bridge Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Awards and Distinctions
2020 |
entry
for registered users |
---|
Location
Location: |
Stadtilm, Ilm-Kreis, Thuringia, Germany |
---|---|
Crosses: |
|
Coordinates: | 50° 45' 39.26" N 11° 3' 8.45" E |
Technical Information
Dimensions
total length | 630 m | |
span lengths | 32.50 m - 5 x 39.50 m - 47.50 m - 75.00 m - 47.50 m - 5 x 39.50 m - 32.50 m | |
number of spans | 15 | |
horizontal radius of curvature | 1 140 m | |
bridge surface | 7 308 m² | |
number of lanes | 2 x 1 | |
deck | deck width | 11.60 m |
girder depth | 1.92 m | |
roadway / carriageway width | 8.00 m | |
longitudinal slope | 0.7 % | |
superelevation | 4.0 % | |
piers | width | max. 4.40 m |
height | 5.72 - 15.00 m | |
thickness | 1.50 m | |
pile caps | width | 6.00 m |
length | 10.00 m | |
thickness | 1.70 m |
Quantities
deck | concrete volume | 7 400 m³ |
prestressing steel | 275 t | |
reinforcing steel | 1 100 t | |
foundations | concrete volume | 2 000 m³ |
reinforcing steel | 350 t | |
substructure | concrete volume | 2 000 m³ |
reinforcing steel | 315 t |
Design Loads
design code(s) | DIN EN 1991-2/NA |
Cost
cost of construction | Euro 12 000 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Soil investigation report
Architectural consulting
Checking engineering
- Roland von Wölfel (checking engineer)
Contractor
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2018. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2018, pp. 55-67.
- About this
data sheet - Structure-ID
20077333 - Published on:
30/04/2019 - Last updated on:
30/04/2019