0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Tunnel TGV de Soumagne
Beginning of works: 2001
Completion: 2005
Status: in use

Project Type

Structure: Tunnel
Function / usage: High-speed rail tunnel

Location

Location: , , ,
Part of:
Connects to: Eastern Entrance Tunnel to the Soumagne Tunnel
Vaux-sous-Chèvremont Tunnel
Coordinates: 50° 36' 32" N    5° 43' 21" E
Coordinates: 50° 36' 11" N    5° 38' 26" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 5 940 m
tunnel section area 69 m²

Quantities

concrete volume 210 000 m³
reinforcing steel 10 000 t
excavated material 670 000 m³
water proofing 140 000 m³
shotcrete 80 000 m³
formwork 900 t
explosives used 600 t
anchor bolts 80 000

Cost

cost of construction Euro 144 000 000

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003256
  • Published on:
    15/05/2002
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine