General Information
Name in local language: | Smíchovská lávka |
---|---|
Completion: | 1930 |
Status: | demolished (9 October 2023) |
Project Type
Structure: |
Pony truss bridge |
---|---|
Function / usage: |
Pedestrian bridge (footbridge) |
Material: |
Steel bridge |
Structure: |
Subdivided Warren truss bridge |
Support conditions: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
Parallel-chord truss bridge |
Location
Technical Information
Dimensions
length | 175 m |
Chronology
9 October 2023 | The footbridge was closed and subsequently dismantled and removed. One part of the footbridge, 30 meters long, was handed over to the National Technical Museum in Chomutov railway depository in 2023. Four parts of the bridge, with a total length of 110 meters, were transported to Mladá Boleslav on Friday, November 3, 2023, where they are to be used to build a footbridge over the Jizera on the piers of the former bridge of the railway siding near the former distillery, which, according to its origin, is to be officially named Smíchovská bridge. The remaining one or two bays of footbridges, piers, and stair structures will probably be scrapped. |
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20087513 - Published on:
18/12/2023 - Last updated on:
18/12/2023