General Information

Beginning of works: August 2011
Completion: October 2011
Status: in use

Project Type

Location

Location: , , ,
Coordinates: 49° 48' 17" N    7° 31' 25" E
Show coordinates on a map

Technical Information

Dimensions

total length 26.30 m
span lengths 12.75 m - 0.80 m - 12.75 m
number of spans 3
bridge surface 156 m²
girder depth 0.66 m
total width 6.20 m

Quantities

deck structural steel 35 t
concrete volume 80 m³
prestressing steel 1.1 t
reinforcing steel 12 t
reinforcing steel content 350 kg/m³
substructure concrete volume 40 m³
reinforcing steel 14 t
reinforcing steel content 350 kg/m³

Design Loads

design speed 150 km/h
live load LM 71; SW/2

Materials

deck steel girders encased in concrete
footbridge prestressed concrete

Case Studies and Applied Products

First bridge built using VFT-Rail girders

First bridge built using VFT-Rail girders

Only 50 hours of closure time were available to replace the two old, 140-year-old steel troughs with a modern bridge structure on the 3511 rail line from Neunkirchen to Bingerbrück. Since the end of October 2011, two VFT Rail girders - t ... [more]

Participants

Owner
Client
Design
Structural engineering
Checking engineering
Contractor
Steel construction
Precastor
Construction supervision

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20064897
  • Published on:
    30/03/2013
  • Last updated on:
    15/01/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine