Eisenbahnüberführung Simmerbach - Pilotprojekt in VFT-Rail-Bauweise mit externer Bewehrung
Author(s): |
Günter Seidl
Martin Mensinger Eckart Koch Franz Hugle |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Stahlbau, February 2012, n. 2, v. 81 |
Page(s): | 100-107 |
DOI: | 10.1002/stab.201201520 |
Abstract: |
Report on the railway overpass Simmerbach, Germany - Pilot project in VFT-Rail construction method with external reinforcement.The German Railway Company DB Netz AG put the first bridge structure using a composite structure with external reinforcement into operation and is gaining experience on the railway link Bingen-Saarbrücken. The new construction method implements a superstructure based on the non-ballast slab-track system. The structure contains a cross-section with external reinforcement manufactured out of rolled sections which are fixed to the precasted element by composite dowels. |
Keywords: |
bridge building bridge construction external reinforcement ballast bed VFT-Rail rail fastening ballast track
|
Available from: | Refer to publisher |
Structures and Projects
- About this
data sheet - Reference-ID
10066682 - Published on:
05/09/2012 - Last updated on:
13/08/2014