0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: November 2012
Completion: 17 June 2016
Status: in use

Project Type

Construction method: Immersed tube method
Function / usage: Road tunnel
Structure: Immersed tube tunnel

Location

Location: , ,
, ,
Address: US Route 58
Underneath of:
  • Elizabeth River
Next to: Midtown Tunnel (1962)
Coordinates: 36° 51' 47.37" N    76° 18' 26.90" W
Coordinates: 36° 51' 12.72" N    76° 19' 12.78" W
Show coordinates on a map

Technical Information

Dimensions

total length 1 130 m
number of lanes 2
number of tubes 1
immersed tube unit width 16 m
height 8.8 m
length ca. 106 m
number 11

Cost

cost of construction United States dollar 2 400 000 000

Case Studies and Applied Products

High-Performing, Cost-Efficient Solutions for Underwater Tunnel Construction

High-Performing, Cost-Efficient Solutions for Underwater Tunnel Construction

To relieve the chronic congestion in and around the existing two-lane Midtown Tunnel in downtown Norfolk, Va., rehabilitation of the tunnel is planned along with building a new two-lane immersed tunnel along ... [more]

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20066899
  • Published on:
    05/03/2015
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine