0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 6 September 1962
Status: in use

Project Type

Function / usage: Road tunnel
Construction method: Immersed tube method
Structure: Immersed tube tunnel

Location

Location: , ,
, ,
Next to: Second Midtown Tunnel (2016)
Coordinates: 36° 51' 43" N    76° 18' 31" W
Coordinates: 36° 51' 15" N    76° 19' 8" W
Show coordinates on a map

Technical Information

Dimensions

tunnel length 1 278 m
depth 27 m

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20023796
  • Published on:
    16/10/2006
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine