0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1839
Completion: 1841
Status: in ruins (1915)

Project Type

Location

Location: , , ,
Crosses:
  • Schoharie Creek
Coordinates: 42° 56' 22.06" N    74° 17' 10.93" W
Show coordinates on a map

Technical Information

Dimensions

total length 190.2 m
span lengths ca. 13.7 m

Materials

piers masonry
arches masonry

Participants

Design

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003417
  • Published on:
    01/06/2002
  • Last updated on:
    24/06/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine