General Information
Name in local language: | Salvador-Allende-Brücke |
---|---|
Beginning of works: | 2017 |
Completion: | 8 November 2022 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Structure: |
Three-span continuous girder bridge |
Material: |
Steel bridge |
Structure: |
Box girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Berlin-Köpenick, Treptow-Köpenick, Berlin, Germany |
---|---|
Address: | Salvador-Allende-Straße |
Crosses: |
|
Replaces: |
Salvador Allende Bridge (1981)
|
Coordinates: | 52° 26' 58.33" N 13° 35' 36.78" E |
Technical Information
Dimensions
total length | 129.00 m | |
span lengths | 36.50 m - 56.00 m - 36.50 m | |
number of spans | 3 | |
bridge surface | 4 066.40 m² | |
deck | girder depth | 2.25 m |
total width | 29.74 m |
Materials
piers |
reinforced concrete
(C 30/37)
|
---|---|
girder |
steel
(S 355)
|
abutments |
reinforced concrete
(C 30/37)
|
Participants
Owner
Client
Measurement concept / monitoring
Checking engineering
-
KLÄHNE BUNG Beratende Ingenieure im Bauwesen GmbH
- Thomas Klähne (checking engineer)
Contractor
Site supervision
Relevant Web Sites
- About this
data sheet - Structure-ID
20081935 - Published on:
08/12/2021 - Last updated on:
01/11/2023