General Information
Name in local language: | Pont de Saint-Nazaire |
---|---|
Beginning of works: | 1972 |
Completion: | 18 October 1975 |
Status: | in use |
Project Type
Structure: |
main bridge: Cable-stayed bridge with fan system main bridge: Three-span cable-stayed bridge approach viaducts: Girder bridge |
---|---|
Support conditions: |
for registered users |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Function / usage: |
Road bridge |
Material: |
main bridge: Steel bridge Structurae Plus/Pro - Subscribe Now! approach viaducts: Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Saint-Nazaire, Loire-Atlantique (44), Pays de la Loire, France Saint-Brévin-les-Pins, Loire-Atlantique (44), Pays de la Loire, France Montoir-de-Bretagne, Loire-Atlantique (44), Pays de la Loire, France |
---|---|
Crosses: |
|
Carries: |
|
Coordinates: | 47° 17' 48.31" N 2° 10' 40.78" W |
Coordinates: | 47° 16' 8.77" N 2° 9' 43.41" W |
Technical Information
Dimensions
total length | 3 356 m | |
main bridge | ||
---|---|---|
main span | 404.00 m | |
total length | 720 m | |
span lengths | 158.00 m - 404.00 m - 158.00 m | |
deck | deck depth | 3.20 m |
deck width | 15.00 m | |
pylons | pylon height (above deck) | 68.00 m |
northern approach viaduct | ||
total length | 1 115 m | |
number of spans | 22 | |
standard span lengths | 50.70 m | |
southern approach viaduct | ||
total length | 1 521 m | |
number of spans | 30 | |
on-center distance between girders | 3.50 m | |
standard span lengths | 50.70 m | |
roadway / carriageway width | 12.00 m |
Materials
cables |
steel
|
---|---|
piers |
reinforced concrete
|
pylons |
steel
|
deck of main bridge |
steel
|
deck of approach viaducts |
prestressed concrete
|
Chronology
18 October 1975 | Opened to traffic. |
---|---|
1998 | Replacement of one cable-stay by Baudin-Chateauneuf. |
2002 | Replacement of three cable-stays by Baudin-Chateauneuf. |
Participants
Initial construction (1972-1975)
Concessionaire
Co-contractor
Strengthening (2010-2014)
Owner
Client
Contractor
Various Maintenance and Rehabilitation Works (1996-2005)
Owner
Enrockment
Stay cables
Bearings
Water proofing
Anti-corrosion protection
Monitoring equipment
Concrete repair
Demolition contractor
Relevant Web Sites
Relevant Publications
- L'architecture et les ingénieurs. Deux siècles de réalisations. Moniteur, Paris (France), pp. 145. (1997):
- Die Ästhetik moderner Schrägseilbrücken. In: Baukultur, n. 3 ( 1998), pp. 12-16. (1998):
- Bridge engineering. A global perspective. Thomas Telford, London (United Kingdom), ISBN 9780727732156, pp. 627. (2003):
- Brücke über die Mündung der Loire zwischen Saint-Nazaire und Saint-Brevin als Schrägseilbrücke mit 404 m Spannweite der Schiffahrtsöffnung. In: Stahlbau, v. 46, n. 4 (April 1977), pp. 120-126. (1977):
- Cable-Stayed Bridges. 40 Years of Experience Worldwide. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), ISBN 978-3-433-02992-3, pp. 77. (2013):
- About this
data sheet - Structure-ID
20000046 - Published on:
28/10/1998 - Last updated on:
05/02/2016