General Information
Project Type
Structure: |
Triple T-section girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Location
Location: |
Bordeaux, Gironde (33), Nouvelle-Aquitaine, France |
---|---|
Crosses: |
|
Coordinates: | 44° 49' 58" N 0° 33' 13" W |
Technical Information
Dimensions
total length | 474 m | |
span lengths | 67.76 m - 4 x 77.00 m - 67.76 m | |
number of spans | 6 | |
deck | deck depth | 3.30 m |
Materials
deck |
prestressed concrete
|
---|
Chronology
1962 | Design competition. |
---|---|
23 April 1963 | Works begin. |
4 April 1965 | Roger Frey, Secretary of the Interior, and Jacques Chaban-Delmas, Mayor of Bordeaux, inaugurate the bridge. |
Participants
Relevant Web Sites
Relevant Publications
- La construction du pont Saint-Jean à Bordeaux. In: Travaux, n. 377 (June 1966), pp. 937. (1966):