General Information
Completion: | 2012 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Three-span extradosed bridge |
Material: |
Prestressed concrete bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Construction method: |
deck: Incremental launching |
Material: |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Gdansk, Pomeranian Voivodeship, Poland |
---|---|
Coordinates: | 54° 18' 50.12" N 18° 41' 8.19" E |
Technical Information
Dimensions
total length | 290 m | |
span lengths | 77.5 m - 135.0 m - 77.5 m | |
number of spans | 3 | |
deck | deck depth | 3.2 m |
pylons | height | 26.0 m |
thickness | 2.5 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
cross beams |
steel
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2016): Examples of Polish Extradosed Bridges – Design and Construction. Presented at: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, pp. 2360-2367.
- About this
data sheet - Structure-ID
20072111 - Published on:
08/11/2016 - Last updated on:
05/06/2022