General Information
Other name(s): | Galleria Raticosa |
---|---|
Completion: | 2009 |
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
High-speed rail tunnel |
Construction method: |
ADECO-RS (Lunardi Method) |
Location
Location: |
Monterenzio, Bologna, Emilia-Romagna, Italy Firenzuola, Firenze, Tuscany, Italy |
---|---|
Part of: | |
Coordinates: | 44° 13' 49.42" N 11° 21' 37.32" E |
Coordinates: | 44° 9' 6.83" N 11° 25' 47.48" E |
Technical Information
Dimensions
tunnel length | 10 450 m | |
interior diameter | 11.5 m |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Risultati dell'impiego dell'approccio ADECO-RS per la realizzazione di gallerie. In: Strade e Autostrade, v. 10, n. 55 (January 2006), pp. 178. (2006):
- About this
data sheet - Structure-ID
20004825 - Published on:
05/09/2002 - Last updated on:
22/07/2014