General Information
Completion: | 1997 |
---|---|
Status: | in use |
Project Type
Function / usage: |
High-speed rail bridge |
---|---|
Structure: |
Through truss bridge |
Material: |
Steel bridge |
Structure: |
Continuous truss bridge Warren type truss bridge |
Construction method: |
Longitudinal launching |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Rathenow, Havelland, Brandenburg, Germany |
---|---|
Crosses: |
|
Part of: | |
Next to: |
Rathenow Bypass Bridge (2009)
|
Coordinates: | 52° 35' 35.80" N 12° 19' 27.24" E |
Technical Information
Dimensions
width | 14.10 m | |
total length | 230 m | |
span lengths | 70 m - 90 m - 70 m | |
number of spans | 3 | |
truss | height | 11.00 m |
Quantities
structural steel | 2 700 t | |
reinforcing steel | 490 t | |
sheet piling | 2 930 m² | |
volume of earthworks | 51 100 m³ |
Materials
piers |
reinforced concrete
|
---|---|
truss |
steel
|
abutments |
reinforced concrete
|
Participants
Design
Structural engineering
Checking engineering
- K. Kirschkowski (checking engineer)
Co-contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Havelbrücke bei Rathenow - Erste Großbrücke für Feste Fahrbahn. In: Bautechnik, v. 75, n. 5 (May 1998), pp. 347-348.
- About this
data sheet - Structure-ID
20043416 - Published on:
05/02/2009 - Last updated on:
06/06/2022