0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2001
Completion: 2004
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Rhone River
Connects to: Lötschberg Base Tunnel (2007)
Coordinates: 46° 18' 27.10" N    7° 50' 7.43" E
Coordinates: 46° 18' 28.54" N    7° 50' 6.23" E
Show coordinates on a map

Technical Information

Dimensions

main span 65 m
bridge surface 57 000 m²
deck deck depth 3.5 m
Northern bridge
total length 820.0 m
span lengths 40 m - 50 m - 4 x 65 m - 3 x 53 m - 45 m
number of spans 10
Southern bridge
total length 556.4 m
span lengths 49 m - 8 x 65 m - 4 x 52 m - 40 m
number of spans 14

Quantities

concrete volume 13 625 m³
prestressing steel 523 t
reinforcing steel 2 535 t
reinforcing steel 115 t

Design Loads

design speed 160 km/h

Cost

cost of construction Swiss Franc 31 800 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Case Studies and Applied Products

RESTON®POT – Pot Bearings

RESTON®POT – Pot Bearings

mageba Pot Bearings are durable bearings that can be used in many situations, whether in big or small bridges, or a variety of engineering structures.

[more]

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20013356
  • Published on:
    15/09/2004
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine