General Information
Completion: | 1993 |
---|---|
Status: | in use |
Project Type
Structure: |
Deck truss bridge |
---|---|
Function / usage: |
High-speed rail bridge |
Structure: |
Warren type truss bridge Continuous truss bridge |
Material: |
Steel bridge |
Location
Location: |
Nantenbach, Neuendorf, Main-Spessart, Bavaria, Germany |
---|---|
Part of: | |
Connects to: |
Schönrain Tunnel (1993)
|
Coordinates: | 50° 1' 49" N 9° 39' 5" E |
Technical Information
Dimensions
main span | 208.00 m | |
total length | 694.50 m | |
deck | deck depth | 7.66 - 15.66 m |
Cost
cost of construction | German Mark 55 500 000 |
Materials
truss |
steel
|
---|---|
deck of approach viaduct |
prestressed concrete
|
Chronology
1994 | Stahlinnovationspreis (Stahl-Informationszentrum) |
---|
Participants
Owner
Original design
Checking engineering
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Eisenbahnbrücke über den Main bei Nantenbach. In: Architektur + Wettbewerbe | Architecture + Competitions, n. 168 (December 1996), pp. 43.
- Fortschritte im Eisenbahn-Stahlbrückenbau Europas. In: Stahlbau, v. 67, n. 8 (August 1998), pp. 612-626. (1998):
- Long span bridges of the new railroad lines in Germany. Presented at: IABSE Symposium: Bridges - Interaction between construction technology and design, Leningrad, USSR, 1991, pp. 501-506. (1991):
- About this
data sheet - Structure-ID
20000412 - Published on:
18/09/1999 - Last updated on:
02/01/2018