0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1997
Completion: 4 February 1999
Duration of works: 24 months
Status: in use

Project Type

Location

Location: , , ,
Coordinates: 36° 8' 54.99" N    5° 26' 34" W
Show coordinates on a map

Technical Information

Dimensions

total length 847.5 m
number of spans 18
roadway / carriageway width 2 x 9.50 m
approach viaducts
deck deck depth 2.20 m
main bridge
span lengths 50.0 m - 125.0 m - 50.0 m
deck deck depth 2.50 - 6.25 m
deck width 2 x 12.45 m

Cost

cost of construction Spanish peseta 2 853 692.688

Materials

deck prestressed concrete
piers reinforced concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20076254
  • Published on:
    30/10/2018
  • Last updated on:
    30/10/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine