General Information
Completion: | 2003 |
---|---|
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Road bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Material hybrid bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! approach viaduct: Prestressed concrete bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Monterrey, Nuevo León, Mexico |
---|---|
Crosses: |
|
Coordinates: | 25° 40' 9" N 100° 22' 49" W |
Technical Information
Dimensions
main span | 185 m | |
total length | 304 m | |
deck | deck width | 28 - 35 m |
pylon | pylon height | 134 m |
Materials
pylon |
concrete
|
---|
Excerpt from Wikipedia
Puente de la Unidad or Viaducto de la Unidad is a cantilever spar cable-stayed bridge designed by Óscar Bulnes that crosses the Santa Catarina River and connects the cities of Monterrey and San Pedro Garza García in the Mexican state of Nuevo León. It is part of a circuit called "Circuito La Unidad", which would consist of the interconnection of a series of avenues.
History
The bridge was finished in 2003 and has been controversial even before its completion because the river it crosses is dry almost all year long.
Although a huge part of the cost of this bridge was done by the business class of Monterrey, they were aware that the Santa Catarina River is affected by overflowing water from saturated rain caused by hurricanes. The San Pedro neighborhood is very well connected to the Colinas San Jerónimo and Cumbres vicinity using this bridge.
Last 2010, Hurricane Alex burst millions of metric tons of water. The water carried garbage on its path, damaging almost every structure of the previously dry river.
This method of construction respects the natural pathway of the dry river at demanding intervals.
Text imported from Wikipedia article "Puente de la Unidad" and modified on July 23, 2019 according to the CC-BY-SA 4.0 International license.
Participants
- Christopher Hall (project engineer)
- International Bridge Technologies, Inc.
- Sistemas Optimos Constructivos SA de CV
- Daniel Tassin (designer)
Relevant Web Sites
Relevant Publications
- Full construction of the Puente de la Unidad. In: News. The VSL-Intrafor Magazine, v. 14, n. 1 ( 2003), pp. 12.
- High skills packed together. In: News. The VSL-Intrafor Magazine, v. 13, n. 2 ( 2002), pp. 6-10.
- Working toward unity. In: News. The VSL-Intrafor Magazine, v. 14, n. 2 ( 2003), pp. 22-30.
- About this
data sheet - Structure-ID
20006024 - Published on:
06/10/2002 - Last updated on:
28/11/2018