General Information
Completion: | 2004 |
---|---|
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Road bridge |
Material: |
Concrete bridge Structurae Plus |
Location
Technical Information
Dimensions
total length | 1 052 m | |
deck | deck width | 34.30 m |
main bridge | main span | 420 m |
number of cables | 128 | |
number of lanes | 2 × 3 | |
main bridge | ||
---|---|---|
length | 820 m |
Quantities
steel for cable-stays | 1 320 t |
Materials
deck |
concrete
|
---|---|
pylons |
concrete
|
Chronology
3 July 2004 | Final pour closes the deck. |
---|---|
15 August 2004 | Expected opening. |
Participants
Owner
Design
Architecture
- Miguel Rosales (architect)
Structural engineering
Construction engineers
Contractor
Stay cables
Stay cable steel supplier
(role unknown)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2007): Cable-stayed Bridges across the Panama Canal and the Orinoco. Presented at: IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007, pp. 56-57.
- (2007): Design and Construction Innovations for the Puente Centenario, Panamá. Presented at: IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007, pp. 234-235.
- Entre deux Amériques. In: Sols et Structures, n. 220 ( 2004), pp. 16-17.
- Flying pace. In: Bridge Design & Engineering, v. 10, n. 35 (2nd Quarter 2004), pp. 41-42. (2004):
- Freyssinet cable-stayed structures. Freyssinet International, Vélizy-Villacoublay (France), 2004, pp. 73.
- About this
data sheet - Structure-ID
20006023 - Published on:
06/10/2002 - Last updated on:
29/03/2020