General Information
Completion: | 2016 |
---|---|
Status: | in use |
Project Type
Material: |
Prestressed concrete bridge |
---|---|
Function / usage: |
Road bridge |
Structure: |
Extradosed bridge |
Construction method: |
deck: Incremental launching |
Material: |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Lomas de Chapultepec, Guerrero, Mexico |
---|---|
Crosses: |
|
Coordinates: | 16° 42' 59.04" N 99° 36' 20.78" W |
Technical Information
Dimensions
total length | 470 m | |
span lengths | 30 m - 40 m - 90 m - 220 m - 90 m | |
number of spans | 5 | |
deck | deck depth | 3.10 m |
deck width | 15.10 m | |
deck slab thickness | 0.28 m | |
launching nose | length | 33 m |
pylons | height | 18.5 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
pylons |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Design
Structural engineering
Contractor
Relevant Web Sites
Relevant Publications
- Distintos sistemas de aislamiento empleados en puentes. In: Hormigón y acero, v. 68, n. 281 (1st Quarter 2017), pp. 45-55. (2017):
- Puente de Barra Vieja, México. In: Hormigón y acero, v. 68, n. 283 (September 2017), pp. 221-228. (2017):
- Puente de velas de barra vieja, México. Presented at: VII Congreso Internacional de Estructuras, Congreso de la Asociación Científico-Técnica del Hormigón Estructural (ACHE), A Coruña, 20-22 de junio de 2017. (2017):
- About this
data sheet - Structure-ID
20075022 - Published on:
28/03/2018 - Last updated on:
28/03/2018