General Information
Completion: | 19 December 2014 |
---|---|
Duration of works: | 9 months |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Haunched girder bridge |
Material: |
Steel bridge |
Structure: |
Box girder bridge |
Location
Location: |
Revin, Ardennes (08), Grand-Est, France |
---|---|
Crosses: |
|
Replaces: |
Pont Saint-Nicolas
|
Coordinates: | 49° 55' 51.88" N 4° 37' 36.78" E |
Technical Information
Dimensions
deck depth | 1.8 - 3.0 m | |
total length | 128 m | |
span lengths | 92 m - 36 m | |
number of spans | 2 | |
number of lanes | 2 x 1 | |
total width | 15.5 m |
Cost
construction cost (without tax) | Euro 7 200 000 |
Materials
deck |
steel
|
---|
Case Studies and Applied Products
TENSA®MODULAR LR & LR-LS – Modular expansion joints
Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions and rotations around all 3 axes.
[more]Participants
Relevant Web Sites
- About this
data sheet - Structure-ID
20070650 - Published on:
04/02/2016 - Last updated on:
05/02/2016