Space for a Company Logo!
This entry is currently a standard company entry. However, with a premium profile the presentation would be a lot different and adjustable, e.g. this would be replaced by the company logo.
Structures & Projects
Participation in the following structures and projects:
- Arquennes Footbridge
- Ghlin Water Tower (2014)
- Gosselies Footbridge (2019)
- Lange Wapperbrug (2012)
- Mosel Viaduct (2006)
- Namur Palace of Justice (2023)
- Neeltje Jans Maritime Radar Tower (2015)
- Noordbrug (Kortrijk) (2011)
- Passerelle La Belle Liégeoise (2016)
- Pont Saint-Nicolas (2014)
- Sado River Railway Bridge (2010)
- Suzan Daniel Bridge (2022)
- Thuin Footbridge (2020)
- Viaduc de la Grande-Ravine (2009)
- Viaduc de la ravine Fontaine (2009)
- Yavuz Sultan Selim Bridge (2016)
Space for a Company Logo!
This entry is currently a standard company entry. However, with a premium profile the presentation would be a lot different and adjustable, e.g. this would be replaced by the company logo.
Contact Information
Related Companies
Bibliography
- Les missions de l'ingénieur. Le Bureau Greisch. Prisme Editions & Mardaga, Liège (Belgium), ISBN 978-2930451-10-7, pp. 384. (2012):
Relevant Publications
- Les missions de l'ingénieur. Le Bureau Greisch. Prisme Editions & Mardaga, Liège (Belgium), ISBN 978-2930451-10-7, pp. 384. (2012):
- About this
data sheet - Firm-ID
1007345 - Published on:
10/02/2006 - Last updated on:
22/07/2014