General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Rochefort, Charente-Maritime (17), Nouvelle-Aquitaine, France |
---|---|
Crosses: |
|
Replaces: |
Martrou Lift Bridge (1966)
|
Coordinates: | 45° 54' 58" N 0° 57' 58" W |
Technical Information
Dimensions
span lengths | 45.5 m - 3 x 79 m - 99.5 m - 120 m - 99.5 m - 5 x 79 m - 45.5 m | |
number of spans | 13 | |
bridge surface | 18 800 m² | |
height above valley floor or water | 42 m | |
span lengths of main bridge | 100 m - 120 m - 100 m | |
total length including abutments | 1 132.5 m | |
deck | deck depth | 3 - 8 m |
deck width | 17.80 m | |
total length of deck | 1 042 m |
Quantities
concrete volume | 20 000 m³ | |
prestressing steel | 630 t | |
reinforcing steel | 2 900 t |
Cost
construction cost (without tax) | French Franc 162 000 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20009248 - Published on:
12/05/2003 - Last updated on:
05/02/2016