General Information
Completion: | 2018 |
---|---|
Status: | under construction |
Project Type
Function / usage: |
Tramway, light or metro rail bridge |
---|---|
Structure: |
Box girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Function / usage: |
Bicycle and pedestrian bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Villenave-d'Ornon, Gironde (33), Nouvelle-Aquitaine, France |
---|---|
Part of: | |
Coordinates: | 44° 46' 41.98" N 0° 33' 58.74" W |
Technical Information
Dimensions
main span | 37.72 m | |
span lengths | 10.10 m - 37.72 m - 11.00 m | |
deck width | 10.75 m | |
number of spans | 3 | |
deck | deck slab thickness | 0.30 m |
girder depth | 0.716 m |
Quantities
structural steel | 230 t | |
deck | concrete volume | 214 m³ |
supports | concrete volume | 270 m³ |
Cost
construction cost (without tax) | Euro 2 500 000 |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
main girders |
weathering steel
|
Participants
Owner
Design
Main contractor
Steel construction
Material supplier
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Extension de la ligne C du tramway de Bordeaux - Ouvrage de franchissement de la rocade. In: Travaux, n. 940 (March 2018), pp. 74-79. (2018):
- About this
data sheet - Structure-ID
20075956 - Published on:
25/09/2018 - Last updated on:
25/09/2018