0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2022
Completion: 2024
Status: under construction

Project Type

Location

Location: , , ,
, , ,
Crosses:
  • Garonne River
Coordinates: 44° 13' 2.17" N    0° 34' 42.83" E
Show coordinates on a map

Technical Information

Dimensions

total length 240 m
number of lanes 2
roadway / carriageway width 2 x 7.00 m
abutments number 2
deck number of longitudinal girders 4

Materials

piers reinforced concrete
deck slab reinforced concrete
abutments reinforced concrete
girders steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20086313
  • Published on:
    10/08/2023
  • Last updated on:
    10/08/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine