General Information
Other name(s): | Plabutschtunnel |
---|---|
Completion: | 30 January 2004 |
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Location
Location: |
Graz, Styria, Austria |
---|---|
Part of: | |
Next to: |
Plabutsch Tunnel (East) (1987)
|
Coordinates: | 47° 1' 58.72" N 15° 24' 25.29" E |
Coordinates: | 47° 6' 30.86" N 15° 22' 41.36" E |
Technical Information
Dimensions
tunnel length | 9 919 m |
Chronology
9 April 2001 | Breakthrough. |
---|---|
30 January 2004 | Opened to traffic at midnight. |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- Inbetriebnahme der Weströhre des Plabutschtunnels. In: Felsbau, v. 22, n. 3 ( 2004), pp. 68. (2004):
- La Pyhrnautobahn. In: Strade e Autostrade, v. 7, n. 42 (November 2003), pp. 52. (2003):
- Type 2200 SM Surface Miner operating in the Plabutsch Tunnel. In: Felsbau, v. 19, n. 4 ( 2001), pp. 61.
- About this
data sheet - Structure-ID
20011283 - Published on:
03/01/2004 - Last updated on:
28/05/2021