0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1 August 1978
Status: demolished (22 November 2010)

Project Type

Structure: Swing bridge
Function / usage: Road bridge

Location

Location: , ,
, ,
Address: Highway 7 / Lougheed Highway
Replaced by: Pitt River Bridge (2009)
Coordinates: 49° 14' 54.50" N    122° 43' 46.11" W
Show coordinates on a map

Technical Information

Dimensions

total length 360.9 m
number of lanes 2

Cost

cost of construction Canadian dollar 2 800 000

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

Relevant Publications

  • Tassin, Daniel / Hall, Christopher (2009): Pitt progress. In: Bridge Design & Engineering, v. 15, n. 54 (1st Quarter 2009), pp. 32-34.
  • About this
    data sheet
  • Structure-ID
    20049453
  • Published on:
    06/12/2009
  • Last updated on:
    05/11/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine