General Information
Project Type
Structure: |
Cable-stayed bridge with harp system |
---|---|
Function / usage: |
Road bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Prestressed concrete bridge |
Structure: |
Three-span cable-stayed bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Port Coquitlam, British Columbia, Canada Pitt Meadows, British Columbia, Canada |
---|---|
Address: | Highway 7 / Lougheed Highway |
Replaces: |
Pitt River Bridge (1957)
Pitt River Bridge (1978) |
Coordinates: | 49° 14' 52.81" N 122° 43' 46.22" W |
Technical Information
Dimensions
main span | 190 m | |
span lengths | 95 m - 190 m - 95 m | |
number of spans | 3 | |
number of lanes | 3 + 4 |
Materials
deck |
prestressed concrete
|
---|---|
pylons |
reinforced concrete
|
Participants
Relevant Web Sites
Relevant Publications
- Pitt progress. In: Bridge Design & Engineering, v. 15, n. 54 (1st Quarter 2009), pp. 32-34. (2009):
- About this
data sheet - Structure-ID
20049451 - Published on:
06/12/2009 - Last updated on:
05/11/2024