General Information
Completion: | 21 October 1957 |
---|---|
Status: | demolished (22 November 2010) |
Project Type
Structure: |
Swing bridge |
---|---|
Function / usage: |
Road bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Port Coquitlam, British Columbia, Canada Pitt Meadows, British Columbia, Canada |
---|---|
Address: | Highway 7 / Lougheed Highway |
Replaced by: |
Pitt River Bridge (2009)
|
Coordinates: | 49° 14' 52.18" N 122° 43' 48.71" W |
Technical Information
Dimensions
total length | 333.5 m | |
number of lanes | 2 |
Cost
cost of construction | Canadian dollar 1 050 000 |
Materials
piers |
reinforced concrete
|
---|---|
swing span |
steel
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- Pitt progress. In: Bridge Design & Engineering, v. 15, n. 54 (1st Quarter 2009), pp. 32-34. (2009):
- About this
data sheet - Structure-ID
20049452 - Published on:
06/12/2009 - Last updated on:
05/11/2024