General Information
Project Type
Structure: |
Rigid frame bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Reinforced concrete bridge |
Support conditions: |
for registered users |
Location
Location: |
Perschling, Lower Austria, Austria |
---|---|
Address: | L2207 |
Coordinates: | 48° 16' 11.73" N 15° 49' 28.19" E |
Technical Information
Dimensions
total length | 43.40 m | |
span | 32 m | |
girder depth | 0.80 - 1.50 m | |
total width | 9.00 m | |
roadway / carriageway width | 6.50 m | |
walkway width | 2 x 0.85 m |
Quantities
concrete volume | 318 m³ |
Design Loads
live load | ÖNORM EN 1991-2 LM 1 | |
differential settlement | +/- 7.5 mm |
Materials
deck |
reinforced concrete
high-strength reinforced concrete |
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Planung und Ausführung einer direkt befahrbaren integralen Brücke in Österreich. In: Beton- und Stahlbetonbau, v. 105, n. 3 (March 2010), pp. 186-195. (2010):
- About this
data sheet - Structure-ID
20058719 - Published on:
31/10/2010 - Last updated on:
05/02/2016