Name in local language: | Ponte Pedro e Inês |
---|---|
Beginning of works: | June 2005 |
Completion: | 26 September 2006 |
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
Deck arch bridge |
Material: |
Steel bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Coimbra, Coimbra, Portugal |
---|---|
Crosses: |
|
Coordinates: | 40° 12' 4.10" N 8° 25' 37.18" W |
Technical Information
Dimensions
total length | 274.5 m | |
span lengths | 30.5 m - 64 m - 110 m - 64 m - 6 m | |
number of spans | 5 | |
height above valley floor or water | 10 m | |
deck | deck width | 4 m |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
piers |
reinforced concrete
|
arches |
steel
|
piles |
reinforced concrete
|
abutments |
reinforced concrete
|
pile caps |
reinforced concrete
|
Chronology
June 2005 | Beginning of construction. |
---|---|
26 November 2006 | Completion. |
Notes
This project was comissioned directly to Structural Engineer Antonio Adao-da-Fonseca, with contract signed with AFAssociados, where Adao da Fonseca was leading partner at the time.
Participants
Design
-
AFAssociados
- António Adão-da-Fonseca (designer)
-
Ove Arup & Partners
- Cecil Balmond (architect)
Structural engineering
- Renato Bastos (structural engineer)
Contractor
Material supplier
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Assessment and control of human-induced vibrations in the new Coimbra footbridge. Presented at: Footbridge 2005 (Second International Congress), Venezia, 06-08 December 2005. (2005):
- Conceptual design of the Coimbra footbridge. Presented at: Footbridge 2005 (Second International Congress), Venezia, 06-08 December 2005. (2005):
- (2015): Continuous dynamic monitoring of lively footbridges. Presented at: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, pp. 1303-1310.
- Design and construction method of the new Coimbra footbridge. Presented at: Footbridge 2005 (Second International Congress), Venezia, 06-08 December 2005. (2005):
- Effectiveness of Horizontal Tuned Mass Dampers Exemplified at the Footbridge in Coimbra. Presented at: Footbridge 2008 - Footbridges for Urban Renewal, Third International Conference on Footbridges, 2-4 July 2008, Porto, Portugal, pp. 311-312. (2008):
- About this
data sheet - Structure-ID
20025717 - Published on:
04/01/2007 - Last updated on:
03/03/2017