Name in local language: পদ্মা বহুমুখী সেতু (Pôdma Bôhumukhī Setu); পদ্মা সেতু (Pôdma Setu)
Other name(s): Padma Multipurpose Bridge
Beginning of works: 26 November 2014
Completion: 23 June 2022
Status: in use

Project Type

Location

Location: , , ,
,
Crosses:
  • Padma River
Coordinates: 23° 27' 23.79" N    90° 15' 43.26" E
Show coordinates on a map

Technical Information

Dimensions

total length 10 642 m
lower deck number of tracks 1
piers number 42
upper deck width 20.65 m
number of lanes 2 x 2
main bridge
total length 6 150 m
main spans 41 x 150 m
vertical navigation clearance 18.30 m
piles length 98 - 122 m
number 262
truss height 12.7 m
northern approach viaduct
total length 1 478.03 m
southern approach viaduct
total length 1 670.03 m

Design Loads

design code(s) BS 5400

Cost

cost of construction 30,193.39 crore

Materials

piers reinforced concrete
truss steel
piles steel
deck slab reinforced concrete
abutments reinforced concrete

Participants

Owner
Feasibility study
Design
Consulting engineers
Detailed design
Checking engineering
Contractor
Earthworks
approach viaducts
Contractor

Relevant Web Sites

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20015184
  • Published on:
    07/02/2005
  • Last updated on:
    29/01/2023