General Information
Official designation: | BW 307b |
---|---|
Beginning of works: | 9 May 2003 |
Completion: | 18 September 2003 |
Status: | in use |
Project Type
Structure: |
Pony truss bridge |
---|---|
Function / usage: |
Bicycle and pedestrian bridge |
Material: |
Steel bridge |
Awards and Distinctions
2006 |
entry
for registered users |
---|
Location
Location: |
Bayreuth, Bavaria, Germany |
---|---|
Crosses: |
|
Part of: | |
Coordinates: | 49° 55' 8.56" N 11° 36' 15.01" E |
Technical Information
Dimensions
span | 59.16 m | |
bridge surface | 178 m² | |
clear distance | 59.03 m | |
deck | deck width | ca. 3 m |
truss | depth | 3.414 - 1.505 m |
Cost
cost of construction | Euro 689 906.52 | |
cost of construction per m² | Euro 3876 |
Materials
truss |
steel tubes
|
---|---|
abutments |
reinforced concrete
|
Participants
Client
Original design
- Autobahndirektion Nordbayern
- Schmitt Stumpf Frühauf und Partner Ingenieurgesellschaft im Bauwesen mbH
Structural engineering
Checking engineering
- Wichert (checking engineer)
Contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Situationsbezogenes Bauwerk. Eine Fuß- und Radwegbrücke über die A9 bei Bayreuth. In: [ Umrisse ], v. 4, n. 1 ( 2004), pp. 28-29. (2004):
- About this
data sheet - Structure-ID
20011876 - Published on:
21/04/2004 - Last updated on:
04/02/2020