0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Official designation: BW 307b
Beginning of works: 9 May 2003
Completion: 18 September 2003
Status: in use

Project Type

Structure: Pony truss bridge
Function / usage: Bicycle and pedestrian bridge
Material: Steel bridge

Awards and Distinctions

2006 entry  

Location

Location: , ,
Crosses:
  • Autobahn A9
Part of:
Coordinates: 49° 55' 8.56" N    11° 36' 15.01" E
Show coordinates on a map

Technical Information

Dimensions

span 59.16 m
bridge surface 178 m²
clear distance 59.03 m
deck deck width ca. 3 m
truss depth 3.414 - 1.505 m

Cost

cost of construction Euro 689 906.52
cost of construction per m² Euro 3876

Materials

truss steel tubes
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20011876
  • Published on:
    21/04/2004
  • Last updated on:
    04/02/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine