General Information
Completion: | 2016 |
---|---|
Status: | in use |
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 445 m | |
span lengths | 38.180 m - 4 x 50.000 m - 3 x 55.000 m - 42.180 m | |
deck width | 2 x 22 m | |
number of spans | 9 | |
girder depth | 3.4 m | |
pier K2 | height | 13.969 m |
pier K3 | height | 24.980 m |
pier K4 | height | 44.695 m |
pier K5 | height | 75.034 m |
pier K6 | height | 81.070 m |
pier K7 | height | 82.036 m |
pier K8 | height | 58.069 m |
pier K9 | height | 25.167 m |
Quantities
deck | concrete volume | 101 476 m³ |
reinforcing steel | 15 221 t | |
piers | concrete volume | 48 162 m³ |
reinforcing steel | 12 041 t |
Design Loads
live load | H30 S24 (KGM) |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Alternative design
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2016): Challenges in seismic design of incrementally launched bridges of Northern Marmara Motorway. Presented at: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, pp. 1023-1030.