General Information

Name in local language: Ponte Newton Navarro
Other name(s): Forte-Redinha Bridge
Beginning of works: 24 October 2004
Completion: 21 November 2007
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Potengy
Coordinates: 5° 45' 22.86" S    35° 12' 8.64" W
Show coordinates on a map

Technical Information

Dimensions

width 21 m
total length 1 781.6 m
number of lanes 4
vertical navigation clearance 55.1 m
pylons height 103.45 m
main bridge
main span 212 m
length 400 m
span lengths 94 m - 212 m - 94 m
number of spans 3
height above valley floor or water 56 m

Materials

deck prestressed concrete
pylons reinforced concrete

Notes

The main cable-stayed bridge is a prestressed concrete structure with a double plane of stay cables and conceived as an integral framed structure between the expansion joints. Piers, towers, deck main girders and stay cables lay in two parallel planes. Piers and towers are box concrete sections; main girders of deck are solid section. All construction is concreted in situ.

The approach viaducts have double columns piers while the deck is made of parallel simply supported precast girders with 40-meter spans.

Participants

Design
Construction drawings
Co-contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20027302
  • Published on:
    06/03/2007
  • Last updated on:
    11/08/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine