General Information
Project Type
Function / usage: |
Railroad (railway) bridge |
---|---|
Structure: |
Warren type truss bridge Continuous truss bridge |
Material: |
Steel bridge |
Structure: |
Through truss bridge |
Location
Location: |
Strasbourg, Bas-Rhin (67), Grand-Est, France Kehl, Ortenaukreis, Baden-Württemberg, Germany |
---|---|
Crosses: |
|
Replaces: |
Strasbourg-Kehl Railroad Bridge (1956)
|
Coordinates: | 48° 34' 32.28" N 7° 48' 4" E |
Technical Information
Dimensions
width | 12.5 m | |
height | 12.2 m | |
length | 238 m | |
span lengths | 107.28 m - 131.12 m | |
number of spans | 2 | |
number of tracks | 2 |
Design Loads
design speed | 160 km/h |
Materials
truss |
steel
|
---|
Notes
The bridge connects the French high-speed rail line from Paris to Strasbourg with the German high-speed rail network.
Participants
Owner
Client
Design
Structural engineering
Checking engineering
- Ulrich Weyer (checking engineer)
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücke über den Rhein bei Kehl. Ersatzneubau mit Fester Fahrbahn. In: Brückenbau, v. 2, n. 2 ( 2010), pp. 22. (2010):
- About this
data sheet - Structure-ID
20020025 - Published on:
15/03/2006 - Last updated on:
09/01/2022