General Information
Other name(s): | Brücke B 512 über den Inn bei Neuhaus |
---|---|
Official designation: | B512 BW 50 (7546507 0) |
Beginning of works: | 2 December 1970 |
Completion: | 23 January 1974 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Single-cell box girder bridge |
Construction method: |
Span-by-span in-situ casting on falsework |
Material: |
Prestressed concrete bridge |
Location
Location: |
Schärding, Upper Austria, Austria Neuhaus am Inn, Passau (Kreis), Bavaria, Germany |
---|---|
Address: | B512 (D) / B137 (A) |
Crosses: |
|
Coordinates: | 48° 27' 49.32" N 13° 25' 49.20" E |
Technical Information
Dimensions
main span | 77 m | |
total length | 418 m | |
span lengths | 51 m - 68 m - 3 x 77 m - 68 m | |
number of spans | 6 | |
deck | width | 13.9 m |
girder depth | 3.3 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Initial construction (1970-1974)
Owner
Client
Design
Structural engineering
- Kurt Wenzel (structural engineer)
Checking engineering
-
Ingenieurbüro Grassl GmbH Beratende Ingenieure Bauwesen
- Hans Grassl (checking engineer)
Prestressing
Recalculation to current codes (2013)
Client
Structural engineering
Checking engineering
-
KMP ZT - GmbH
- Hermann Hintringer (checking engineer)
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20032691 - Published on:
29/10/2007 - Last updated on:
11/04/2016